Experience

Represented power plant developer in connection with preparation of joint EIS/EIR for construction and operation of 600-megawatt thermal power plant on Indian trust lands.  Key issues included the scope of state and local agency jurisdiction and environmental review for project located on federal land, transport of hazardous materials, and air pollutant emissions.